Parker wilson SustainParker wilson SustainParker wilson SustainParker wilson Sustain
  • Home
  • About Us
    • Company Information
    • Client List
    • Careers
    • Corporate Responsibility
    • Charity
    • Useful Links
  • Services
    • Building Physics
    • Facilities Management
    • Building-Services Appraisals
    • Energy and Carbon Management
    • Low and Zero Carbon Technologies
    • Statutory Reporting
  • Design
  • Projects

Part L (BRUKL) Compliance

    Home Regulations & Compliance Part L (BRUKL) Compliance
    NextPrevious

    Part L (BRUKL) Compliance

    By Phil Grice | Regulations & Compliance | Comments are Closed | 27 August, 2014 | 0

     

     

     

    Parker Wilson Sustain were engaged in early Part L Compliance consultation with the Client and Architect for a new office building at Perstorp UK’s Warrington site. The Client had aspirations for a naturally ventilated office space providing comfort conditions for forty employees, plus meeting rooms, hot offices and a project space.

     

     

    Working with our DSM package and the Architect’s initial design work, Parker Wilson Sustain were able to undertake:

    • Natural ventilation and overheating risk assessments to establish the extent of low level louvres and roof mounted vent turrets required to effectively maintain comfort conditions.
    • Low and Zero Carbon energy study to establish the most cost effective way to deliver the required 10% on-site energy generation.
    • BRUKL assessment to ensure Part L compliance as well as informing the architectural and building services design.

    The above allowed the design team and Client to understand how the design would need to develop from the early stages of the project. The main office space is fully naturally ventilated and the building is provided with 30% of its energy demand via low carbon air source heat pumps, which serve an under-floor heating system.

    No tags.

    Phil Grice

    More posts by Phil Grice

    Related Post

    • UK government to invest £10m into £51m scheme to create world’s largest tidal power array in northern Scotland

      By Phil Grice | Comments are Closed

      The UK Governement have agreed to invest £10m into the £51m ‘Meygen Tidal Stream Project’ which is set to create the world’s largest Tidal Power scheme in Scotland. The UK already has around 50% ofRead more

    • What is ESOS?

      By Phil Grice | Comments are Closed

      ESOS is the Government’s new Energy Saving Opportunity Scheme. The latest scheme guidance was issued on 15th July, which and answers some of the questions people have been asking regarding how the scheme will operate. General notesRead more

    • ljmu_2504384b

      Parker Wilson Work With Local Universities and the Designers of Tomorrow

      By Phil Grice | Comments are Closed

      Parker Wilson Senior Mechanical Engineer Rob Greenwood visited Liverpool John Moores University this week as part of their third year students’ project reviews. Rob was helping the students with respect to projects from a mechanical,Read more

    • Fossil Fuel Activities Drive Record Greenhouse Gas Emissions

      By Phil Grice | Comments are Closed

      The levels of gases in the atmosphere that drive global warming increased to a record high in 2012. According to the World Meteorological Organization (WMO), atmospheric CO2 grew more rapidly last year than its averageRead more

    • Part L 2014

      Part L 2014

      By Phil Grice | Comments are Closed

      Those hoping for details of the forthcoming 2013 Building Regulations will be disappointed to hear that it will now be April 2014 before the changes are rolled out. The explanation from DECC appears to beRead more

    • More Uncertainty For Part L 2013

      By Phil Grice | Comments are Closed

      A delay to the publication of revisions to regulations that govern the energy efficiency of buildings, considered crucial for delivering the UK’s carbon targets, could put back implementation of the changes by up to sixRead more

    • Risk of Blackouts by 2015?

      By Phil Grice | Comments are Closed

      The government has dismissed a proposal that big shops and factories could be paid to cut their energy use to prevent shortages leading to blackouts. Electricity network owner National Grid has suggested large consumers couldRead more

    • UK Failing on Carbon Reduction

      By Phil Grice | Comments are Closed

      The UK is not on track to hit its climate change targets through the 2020s, government advisers have warned. The Committee on Climate Change said carbon emissions rose in 2012 by 3.5%. After the figuresRead more

    NextPrevious

    Parker Wilson Offices

    Manchester
    Burnham House
    373 Bury New Rd
    Manchester
    M25 1AW.
    T : +44 (0) 161 773 1177
    E : manchester@parker-wilson.co.uk
    London Office
    2nd Floor
    72 Cannon Street
    London
    EC4N 6AE
    T : +44 (0) 207 251 4500
    E : London@parker-wilson.co.uk

    Modern Building Services Articles

      Government Publications

      The Latest from GOV.UK

      Sorry, this feed is currently unavailable or does not exists anymore.

        • e-Mail
        • Login
        Copyright 2015 Parker Wilson Consulting | All Rights Reserved | Webmaster mark.knowles@parker-wilson.co.uk
        • Building Physics
        • Building-Services Appraisals
        • Energy and Carbon Management
        • Facilities Management
        • Home
        • Low and Zero Carbon Technologies
        • Statutory Reporting
        Parker wilson Sustain